Baru Group

A 100% West Australian Owned and Operated Indigenous Civils & Concrete Construction Company.

Formwork and Concrete Installation

Civil Construction Projects

Manufacturing and Installation

Confined Space Operations

Project Management

Hire of Construction/Maintenance Labour

Hire of Formwork Systems

Hire of Plant and Equipment

Bulk Cartage and Freight Services

Supply Nations Registered  

Australia’s leading database of verified Indigenous businesses, click to view our Supply Nation Profile.

Baru Group has worked on projects that include the following:

 

  • Civils and Concrete Package for Waste Water Treatment Plant (WWTP), Potable Water Treatment Plant (PWTP) and Power Station, FMG Eliwana – Waste Water Services (WWS) July 2019 – Present

  • Stacker 15 Rail Replacement Project, Tom Price – Rio Tinto (May 2019 – Present)
  • Structural Integrity Remediation Project, West Pilbara – Kaefer Maicon, Rio Tinto (April 2019 – Present)
  • B2 Stacker Rail Sleeper Replacement Project, Brockman 2 – Rio Tinto (2018-Present)
  • Twin Boom Stacker Rail & CV300 Project, Civil & Earthworks, Dampier Salt, Port Hedland (2018)
  • Wet Salt Dump Bridge, Dampier Salt, Dampier (2018)
  • Mundaring Weir Outlet Works Upgrade Stage 2 –, Clough, Water Corp WA (2017/2018)
  • Fencing and Landscaping, Erramurra Village – Waste Water Services, Citic Pacific (2017)
  • Ring Beam, Eramurra Village – Waste Water Services, Citic Pacific (2017)
  • Repairs to Soft Ground, Line 7 North RSM Workshop, Cape Lambert – Rio Tinto (2017)
  • Drop Table Pit Modifications, 7 Mile – Marand, Rio Tinto(2017)
  • Concrete & Formwork package, Sino Iron Cape Preston Airport – Decmil, Citic Pacific (2016/2017)
  • Civil Works, RSM Facility Cape Lambert – Marand, Rio Tinto (2016)
  • External Demolition Works, Wheelset Laydown Area RSM Workshop Cape Lambert – Marand, Rio Tinto (2016)
  • Drainage Channel, Cape Lambert – Ahrens, Rio Tinto (2016)
  • Precast Units, Karratha – Primero Group (2016)
  • Fire Water Pit Extension, Cape Lambert – Marand, Rio Tinto (2016)
  • Trenching Work, Sino Iron – G & S Engineering, Citic Pacific (2016)
  • Concrete footing and footpath at Searipple, Approach slab and wedge at boat ramp- Ertech (2016)
  • Portal Lathe Pit/Footings and Ancillary Works, Cape Lambert – Marand, Rio Tinto (2016)
  • Ring Beam, Port Hedland Landfill Site – Waste Water Services (2016)
  • Reinforcement Cages for Culverts – Subcon Technologies (2016)
  • Access Tower Foundation, 7 Mile – Kempe, Rio Tinto (2016)

A Provider of Choice for Civil & Concrete Construction Services